Login Form






Lost Password?
No account yet? Register

Syndicate

2.4 install receiver
2.4 install receiver
Steps of receiver installation:
1. You can mount a tripod on a selected point. Please make sure the surrounding meet these
conditions: avoid under shade and 2.4 install receiver
Steps of receiver installation:
1. You can mount a tripod on a selected point. Please make sure the surrounding meet these
conditions: avoid under shade and building, keep away from reflecting things and
electromagnetism interfering, etc.
2. Open the instrument box carefully, take out centering apparatus and base-plate to mount them
on the tripod, center and level base-plate on the surveying point.
6
9600 surveying system
 
 
Copyright © 2007 totalstationshop.com |  Privacy Policy | Terms of Use
Our daughter company: China Wholesale Electronics 247 online store.